April 2006
The Guild built and installed 13 cabinets for the school.
Large cabinet ready to go
Open view
Karl and Danny off-loading
Ken and Jim bringing one in
The crew: Craig Jacobs (School Principal), Karl Kelly, James Childress, Chris Lusk, Ken Young, Allen Howell, Darryl Roberson, and kneeling Danny Goodson, Rusty Hill, Jim Kilton
March 2006
On March 2, the Guild moved 10 pieces (3 changing tables, 3 diaper cubbies, and 4 prototypes of other storage cabinets) from the Guild Education Center to SCSDB.
Rusty Hill, Jim Kilton, and Aubrey Rogers bring out the first cabinets from the shop
Rusty and Jim prepare to hoist the diaper cubby into the truck
Jim and Aubrey wheel out the locker-style cabinet
Jim and David Favreau load a changing table Dave demonstrates his "dolly with bed rails" invention
Another view of the invention
The truck handles all 10 pieces, with nothing to spare
Opening up at the school
Rusty, Bill Brett, David, Aubrey, and Jim unloading
Aubrey discussing the project with Craig Jacobs, director of the school
Guard rail removed to fit through door
David and Darryl Roberson reinstalling the guard rail
Another guard rail being reinstalled
Changing table in place. The diaper cubby will be hung on the wall above the table
Wheeling in another piece
More pieces waiting to be placed
Darryl telling the crew that he knew it was going to be easy
February 2006
On Friday, February 24, 2006, Guild members gathered at their Education Center to build four prototypes. These will serve as models for the remainder of the 50 units to be built. Volunteers are needed now. Contact Aubrey at asrwood@bellsouth.net.
Bill Keener with his large cabinet
A large cubby
Darryl Roberson, James Childress, Richard Mackintosh and Jack Gunter with one of many changing tables
Herb Ireland and Karl Kelly working with a cubby
The large cabinet with its adjustable shelves installed
Copyright © 2018 Greenville Woodworkers Guild